Solar installation in Grays: from enquiry to handover

Know who handles your booking, survey, quotation, installation and export paperwork at each stage of a solar project.
2 min read·Updated 7 September 2026

1. Explain what you want from solar

Provide your postcode, property type and approximate electricity use. Mention a battery, EV or heat pump you are considering, as well as planned roof work. Grays Solar passes enquiries to partner installers; you do not enter an installation contract by completing our form.

    2. Agree the next appointment

    Partner installers can get potential customers booked in within 24 hours of receiving an enquiry. That is a booking response, not a promise that a survey or installation will be completed in that time. Agree the appointment date, purpose and any access arrangements directly.

      3. Review the survey and proposed design

      Ask the installer to assess roof condition, shade, available space, electrical supply and equipment locations. The written proposal should explain the recommended capacity, predicted generation and any additional checks. Raise questions before accepting the scope.

        4. Compare the contract and permissions

        Check the legal installer name, payment schedule, equipment, exclusions and warranty terms. Agree who handles planning matters, building-regulations requirements and the network operator’s process. Any necessary prior approvals should be resolved before dependent work starts.

          5. Confirm the installation programme

          The installer sets the timetable for access, scaffolding, roof work and electrical work. Ask about disruption, weather delays and the procedure if extra work is discovered. Installation duration varies by project; we do not promise every property will be completed in one day.

            6. Check the handover

            Before treating the project as complete, obtain the agreed records and a demonstration of the system. Keep the fault-reporting and aftercare contacts. Your chosen energy supplier confirms the requirements for export payments.

            • Commissioning and electrical documents
            • Relevant installation certification
            • Network notification or connection records
            • Product and workmanship warranties
            • Monitoring access and operating instructions
            • Documents needed for an export-tariff application

            Sources and further guidance

            Checked 7 September 2026. Confirm current requirements with the relevant provider or authority.

            Explore the related service and installer questions

            Want a number for your roof?

            A partner installer can get your next appointment booked within 24 hours of receiving your enquiry. Survey and installation dates are agreed separately.

            Start an installer enquiry

            Keep reading

            Your next step

            Let’s see what your roof can do.

            Tell us about your property, electricity use and the solar options you would like to explore. Partner installers can get your next appointment booked within 24 hours.